Projects that Need Leadership
The following projects need leadership to complete - if you would like to take one on call Marty Klein, CHS Administrator at 509-236-2224
Boys Locker Room
- Repair tile floor
- Strip the shower floor and resurface
- Install shower curtains
- Install cubby lockers (we have them)
Gym
- Pad front lip of stage
- Pad 2 more posts
Field
- Paint the bleachers
- Reconfigure the soccer field
- Redo play toys and pad ground beneath
- Stain grade school big toy
High School Building
- Repair paint lockers
- Finish painting lunchroom doors and detail
- Paint exterior doors